Electrical Engineer

Department Icon Operations Maintenance & Support
85+ Applicants
Posted: 6 months ago
7-12 years
Nellore, Tamnar, Angul
work from office

Posted: 6 months ago
|
Applicants: 85+
Job Description
About Company
Similar Jobs
Please verify your account first! Send OTP

Please click on the Apply to verify the status of jobs posted more than 15 days ago, as they may have expired. Similar Jobs

Job Description

*Roles and Responsibility/Duties to be performed:-
1. Deep Knowledge Main Plant Electrical System (BTG)
2. 400 KV Switchyard, 220 KV, 33 KV Switchyard maintenance, trouble shooting, Operation.
3. Numerical relay / Relay Protection System
4. HT switchgear panel/ LT switchgear panel
5. GRP, STRP, AVR, BTS
6.TCS Electrical System.
7. Ability of Cost optimization & spares planning
8. Manpower Planning & Management
9. Ability of Maintenance Planning

10. Switchyard condition monitoring like Thermography, Schedule testing, etc.

11. Switchyard GRID compliance knowledge.

12. Testing of 400KV, 220KV breaker, CT, CVT, LA's transformer etc.

13. Knowledge of Switchyard protection system and Schemes like distance protection, bus bar protection, AR etc.

14. Testing of distance protection, bus bar protection, LBB relay.


*Functional Competencies:-


1.Core Expertise in Switchyard, Numerical relay/Relay Protection System
2.Min 10yrs's experience in power industry
3.Deep Knowledge in Main Plant Electrical System (BTG)

Looking to get Placed? Try our Placement Guarantee Plan


4.Knowledge in Electrical maintenance & planning
5.Knowledge of Cost Optimization & Spare planning
6.Knowledge of spares planning & Inventory Management


*Behavioral & Management Competencies:-

1. Leadership Quality
2. Ability of Team building
3. Analytical Skills
4. Collaboration
5. Communication & Presentation Skills
6. Adaptability

Skills

SwitchyardHt SwitchgearVFDLT SwitchgearBTSTCSSTRPLTTesting

If an employer asks you to pay any kind of fee, please notify us immediately. Jobaaj does not charge any fee from the applicants and we do not allow other companies also to do so.

About Company

Jindal Power Limited (JPL), a subsidiary of Jindal Steel & Power Limited, is a leading power company in India across the energy spectrum: thermal, hydro and renewable. JPL has been contributing significantly to the growing needs of power in the country and its installed capacity is 3400 MW. JPL commissioned the first unit of its 4x250 MW thermal power plant in the Raigarh district of Chhattisgarh in 2007, becoming the first private player in the country to set up an Independent Power Plant (IPP). Since then, this flagship has operated as a fully integrated power plant at an industry-leading Plant Load Factor (PLF) of 93% (average for last seven years). Since its inception, a 6.9 km long cross-country conveyor belt (the second longest in Asia), was installed to feed coal to the plant. Among the other integrated facilities built by JPL are a dam to feed water to the plant and a 258-km long 400-KV double circuit transmission line to pump the power into the National Grid. Buoyed by the success of its 4x250 MW plant, JPL has further expanded its presence in Tamnar with a 2,400 MW (4X600 MW) thermal power plant. With the completion of the mega expansion project, the Groups installed capacity now stands at 37.6 Billion Units of Electricity annually, i.e. 3.58% of India’s Electricity Generation in 2014-15. The completion of 2400 MW expansion project has taken Jindal Power Limited’s (JPL) installed capacity to 3400 MW, thereby making it one of the largest private power producer in the State of Chhattisgarh. JPL has emerged as a best performer in Ministry of Power and Central Electricity Authority project execution excellence study and won two National Awards- Gold Shield and Silver Shield for early completion of Thermal Power Projects. The 2400 MW super thermal power project was completed in a record time. To optimize its operation, the company has adopted leading edge technologies, efficiency processes and world best practices in project execution and management, thereby setting new benchmarks in India’s power sector. JPL has consistently topped the Central Electricity Authority’s highest plant load factor list among the major thermal power plants (above 200 MW capacities) in India.
Read More

Important dates & deadlines?

Application Deadline

21 Dec 25, 05:45 PM IST

Similar Jobs

View All
Loading...
Bag Logo
Jobaaj
Don't Miss out any Updates

Subscribe now for the latest job alerts
and never miss an update

Job Alert
Google hiring for Specific Roles Apply Now!
1 min ago
New Opportunity
Amazon is hiring freshers Apply Now!
5 min ago
Featured Jobs
Microsoft opening 50+ positions Apply Now!
10 min ago

Electrical Engineer

Share with